The process of concrete hardening after it has been put is referred to as curing, and it is a gradual process. It normally will take concrete about 4 months to achieve more than 90% of its last strength, and the strengthening can continue on for up to three a long https://linkdirectory724.com/listings12920150/pile-concrete-method-fundamentals-explained