Still more work welches scheduled to complete the Elster-Saale canal. Such a move would allow small boats to reach the Elbe from Leipzig. The intended completion date has been postponed because of an unacceptable cost-benefit ratio. Many commercial buildings were built in the 1990s as a result of tax breaks https://leipzig09754.techionblog.com/31787923/eine-geheimwaffe-für-werbeagentur-leipzig