The main park contains a capacity of two hundred MW even though Sandrini II has a capability of a hundred MW. The entire cost of both of those tasks weren't disclosed however, for the duration of construction, above two hundred staff ended up used. The projects are envisioned to find https://californiasolarpanelinstallation.tech.blog/2024/10/18/how-can-you-live-an-environment-friendly-life/