I've an present paved patio location. I know that this will crack is the material is laid direct. If I clear away the slabs and compact the sub foundation will this be sufficient to lay the porous content on or do I would like ro concrete over and lay the https://resinboundinstallations24578.blogscribble.com/38091226/facts-about-resin-bound-installations-revealed