Penmann successfully delivered a tailored HVAC upgrade at Nutricia’s Liverpool facility, implementing a bespoke ventilation and climate control system built to comply with demanding hygiene and production criteria. The scope included the complete lifecycle delivery of high-specification HVAC systems across civil, Medium Care (MC) and High Care (HC) areas. Based https://social-medialink.com/story5682492/the-penmann-team-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2